翻訳と辞書
Words near each other
・ East Timor–Sahrawi Arab Democratic Republic relations
・ East Timor–United States relations
・ East Tintic Mountains
・ East Tipperary (UK Parliament constituency)
・ East Tisted
・ East to West
・ East to West (song)
・ East Toowoomba, Queensland
・ East Toronto
・ East Torrens Baseball Club
・ East Torrens Football Association
・ East Torrens Messenger
・ East Torrey Glacier
・ East Touch
・ East Tower (video game)
East Town Railway Workshops
・ East Towne Mall
・ East Towne Malls
・ East Townsend, Ohio
・ East Township, Carroll County, Ohio
・ East Transfer Center (Dallas, Texas)
・ East Tremont, Bronx
・ East Trenton Heights, New Jersey
・ East Trenton Public Library
・ East Trenton, New Jersey
・ East Trinidad cricket team
・ East Trolley Side Tunnel
・ East Troy (disambiguation)
・ East Troy (town), Wisconsin
・ East Troy Electric Railroad


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

East Town Railway Workshops : ウィキペディア英語版
East Town Railway Workshops

The East Town Railway Workshops were a major manufacturing, maintenance and repair facility of the New Zealand Railways Department (NZR) located by the Marton - New Plymouth Line in the city of Wanganui in New Zealand’s North Island. Output included not only rolling stock but also tools, equipment, huts, furniture and tarpaulins. It was a prodigious facility, and one of the larger employers in the city. Its name is sometimes formatted as Eastown or Easttown.
== History ==
East Town was commissioned in August 1880 and was the second railway workshops established as part of Julius Vogel's public works programme. A contract was let in 1879 by public tender to the Wanganui firm of Gibbes and Pinches for the construction of a Locomotive Erecting Shop, Machine Shop and Wood Mill. The following year, a second contract was let to Thomson and McLean to construct the Blacksmiths Shop and attached Boiler Shop. Work up to 1900 focused on the repair of rolling stock operated in the area between Taranaki and Hawke's Bay.
In 1900, the Engine Shed was relocated to the north-west corner of the yard. A single-road Paint Shop was erected, a wagon servicing pit was built, and the Erecting Shop was extended.
As a result of the Royal Commission of 1925 conducted by English railwaymen Sir Sam Fay and Sir Vincent Raven, the output of the workshops changed. The capacity of the Locomotive Shop was dramatically reduced, and the Tarpaulin Shop augmented to handle the production requirements of the entire North Island. The Points and Crossings Shop previously located at the Addington Workshops was relocated to East Town.
East Town had been operating as two complete sets of workshops for both the Maintenance Branch and the Locomotive Branch, separated by only a road. In August 1931, it was decided to amalgamate the facilities into a single operation, a move that proved to be beneficial for the staff in the form of improved conditions and schedules. As a result of this amalgamation, it was necessary to move the Points and Crossings Shop to the Hutt Workshops and the workshops once again focused on the repair of locomotives, carriages and brake vans. Later work done at East Town also included the manufacture and repair of tools, velocipedes, track gauges, railway huts, furniture for railway stations and offices, and heavy track machinery. Overhauls on shunting locomotives were also carried out at East Town from 1963, work that was previously done at the Hutt Workshops.
Between 1947 and 1949, land was purchased at the west end of the yard and various workshop buildings were extended. A new Motor Shop was also erected. The first intake of apprentices, comprising nine carpenters and six fitters, started in January 1949 once a suitable building had been acquired. Further extensions were made to the Tarpaulin Shop in 1950, and a new Wagon Shop was also built.
One thing for which East Town became particularly well known was the production of tarpaulins to cover goods wagons which were used at stations across the country. These were originally made of canvas and treated with linseed oil and vegetable black to weather-proof them. As the work was initially done by hand, those employed to make them were usually sailmakers by trade, with mechanisation not introduced until 1915. At the end of 1914, a new Tarpaulin Shop was commissioned, but it did not last long, being destroyed by fire in January 1915. In 1928, a dedicated tarpaulin factory was opened and, with the transfer of staff from the Newmarket Workshops, production increased to the rate of 50 tarpaulins per week. The Tarpaulin Manufacturing Shop was raised by fire on 5 August 1954, requiring an increase in the output of the Addington Workshops until the destroyed facility at East Town was replaced mid-1955. Just two months later, on 18 October, the Tarpaulin Depot Repair Shop was similarly destroyed. In 1973, NZR switched to using PVC tarpaulins which were cheaper to make and easier to repair.
East Town closed on 17 October 1986 as the result of an effort by the New Zealand Railways Corporation to rationalise its workshop facilities around the country. At the time it closed, it was the employer of over 450 local residents. A replacement facility constructed at Aramoho has also since been closed.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「East Town Railway Workshops」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.